Container weighing service to shipping lines

Twitter
Facebook
LinkedIn
Email

Authorship

Beat Zwygart, director, Lasstec, Sciez, France

Publication

The International Maritime Organization (IMO) is expected to make the weighing of sea containers mandatory. The purpose is to make the entire container supply chain safer. This regulation is expected to be issued through the International Convention for the Safety of Life at Sea (SOLAS Convention) as a result of a number of accidents involving container losses and container stack collapses. The existing SOLAS regulation already obliges shippers to declare the correct container weights, but this is not always done. The new regulation is likely to require specifically that the container is actually weighed or calculated by reference to the contents, packing and securing materials and the tare weight of the container itself. Importantly, however, the regulation is anticipated to forbid the loading of containers unless the verified gross mass is available to the terminal and the ship’s master.

Practically speaking this means that the shipping lines may require terminals to verify container weights prior to being loaded onto their ships. There will, however, be a cost to it which the shipping lines are likely to pass on to their shippers. But besides added safety, there is another important aspect: optimising ship stowage which should reduce fuel consumption for the shipping lines. A ship is more stable at sea and consumes less fuel when the center of gravity is low and if the cargo is optimally distributed. Therefore, it is in the interest of the shipping lines to know the exact weights. Arguably, there are multiple aspects which determine fuel consumption of a ship, and some may be more important than stowage, but this is nevertheless a factor.

Determining container weights and related costs

First of all, to weigh a container and to use the load information to update the stowage plan, containers need to be weighed preferably at the completion of packing. Clearly, weighing export containers needs to be done sufficiently in  advance for the stowage plan to be optimised. If the actual weight is not determined at the completion of packing, the port is in a prime position to provide this service or, indeed, to verify the documented weight. For containers that arrive at the port by road, rail or river an obvious ‘check point’ is during the inward process. Weighing with the quay side crane is too late, since the container position on the ship is determined well before loading.

Weights of transshipped containers should be verified at the original port of loading, but there will always be situations where this has not been physically possible. In that event, it can be said with certainty that every container, whether exported or transshipped, will pass through the stacking yard. It is therefore argued that equipping the stacking cranes with weighing systems best caters for all circumstances. Operators in those countr ies that require imported containers to be weighed may consider weighing with quay side cranes as well.

What does it cost to weigh a container? Let’s base the calculation on the capacity of a quay side crane which can typically load 100,000 twenty-foot equivalent unit (TEU) per year. Let’s also assume there are three rubber-tyred gantry cranes (RTG) or rail-mounted gantry cranes (RMGs) required per quay side crane. Let’s further assume a weighing system costs US$20,000 per stacking crane and it is amortised over three years. The cost per year to weigh 100,000 TEU is therefore US$0,20 per TEU. In addition to the capital expenditure for the weighing equipment, the terminal will incur some integration costs plus ongoing maintenance and administration costs, so let’s double this amount to US$0,40 per TEU. Weighing by the stacking cranes during the handling of the containers is also more economical than weighing with weigh bridges which very often involve manual intervention, when trucks are carrying two 20 foot containers which need to be individually weighed. Weighing in the stacking yard is therefore the fastest, most economical and non-disruptive way to the operation. Some terminals have calculated that they could offer their weighing services for US$1 per TEU and earn a profit with it.

The cost to a shipping line

A ship with a capacity of 8,000 TEU consumes 225 tonnes of fuel per day at a sailing speed of 24 knots. The price of bunker fuel end of 2012 was at around US$600 per tonne. For a journey of 21 days, the ship will therefore consume US$2,8 million worth of fuel. The charge by the terminal for verifying the container weights of this ship would be US$8,000 or 0,3 per cent of the total fuel burned over the 21 days. To put the weighing charge in perspective of the fuel cost, it will be equivalent to less than 90 minutes of sailing time. The question to ask now is how much fuel the ship can save if it is optimally loaded? If the fuel saving exceeds the cost of verifying the container weights, then it should be in the interest of the shipping line to buy the weighing service from the terminals. Thus, arguably, while the terminals should be compensated for providing this new service, the overall cost to shipping may be negligible.

There are several possible methods of weighing containers. We already talked about weigh bridges at the entry of the terminal. They are potentially the most accurate, but they are not conveniently situated for transshipped containers. Moreover, users need to take account of continuing maintenance and calibration costs and in particular the additional labour costs to weigh containers separately if a single truck arrives with two 20 foot boxes. Stacking cranes very often have weighing systems on the trolleys or rope anchors. They are less accurate and where cranes are equipped with twinlift spreaders these systems cannot weigh each box individually. Lasstec based in France, has developed a weighing system with a fibre optic sensor bonded into the centre of the twistlocks. The system allows the weighing of containers during the loading cycle so not to disrupt the work flow. The system can be installed easily into any existing or newly built spreaders.

To read the full article download PDF

Cookie Policy. This website uses cookies to ensure you get the best experience on our website.