Bigger ships mean more moves per call, which in turn means a logical requirement for additional berth capacity, or so conventional wisdom would state. This article contends that upgrading berth capacity alone in order to tackle mega-ships will lead to congestion throughout yard facilities. I believe that additional capacity can be achieved whilst avoiding the spectre of congestion by improving the efficiency of each quay crane at a berth and by increasing the number of quay cranes on one ship.

The NGICT concept

Because the new generation integrated container terminal (NGICT) concept is so expansive and there’s limited space with which to explore the many facets and nuances of the concept in this article, this piece touches only the main characteristics of this new concept and focuses on the stack area in most detail. This is because increasing the ...

Click here to see the update of this paper


  Navis World      Container Handling, Port Planning, Design & Construction

 

 

Navis World

PTI EDITION 65

This exclusive edition has a special 8-page section dedicated to Navis World, which took place from March 29 - April 1. The edition includes a new automation and optimisation section which includes articles by Navis Oscar Pernia on the forces driving container shipping growth and 'Google Glass'. As well as automation, there are more new articles in our 'Mega-Ship Ready' section, which was introduced in the previous edition, and delves into some of the issues posed by mega-ships and alliances.

 Download App  Download App

  Desktop Version