Flexibility at Sharjah Container Terminal

Subscribe for access
Author thumbnail
Author(s): Richard James, Terminal Manager, Sharjah Container Terminal

Sharjah was the location for Gulftainer’s first operation which started 38 years ago and holds the distinction of being the first purpose-built container terminal in the Arabian Gulf. Starting with a single berth serving geared vessels by just a handful of men, one of whom still works at the terminal today, Sharjah Container Terminal (SCT) has grown into a thriving facility which will pass the 400,000TEU milestone for annual throughput later this year and boasts five quayside cranes operating at very competitive productivity rates.

Main equipment

The terminal now has four designated berths totalling 760m and an available depth of 12.5m. The two Liebherr ship-to-shore (STS) gantry cranes are supplemented by three mobile harbour cranes (MHC), two Gottwald GHMK 7608s and one Liebherr LHM400, which in various configurations can be combined to best suit each vessel caller…

To read the full article, download the PDF


Featured in the Edition:

Panama Canal Edition

PTI Edition 63 • Digital & Print
This exclusive edition celebrating the Panama Canal's 100-year anniversay begins with a new section focusing on the Panama Canal and includes a brief history of the Canal from the first attempt at its construction to the on-going expansion project, as well as a guide to Panamax vessel sizes. Elsewhere is an exclusive section for port tyres, featuring interviews with GRI and BKT Tyres.