Jul 17, 2008 EUROGATE Tanger successfully handles first feeder ship Tangier (Morocco) - On 11 July, EUROGATE Tanger successfully handled the first feeder ship. On 11 July 2008, the first feeder ship, the CMA CGM "Tobruk", docked at the EUROGATE Tanger Container Terminal in Morocco. A total of 70 containers were unloaded. Although the crane drivers are still undergoing training, the handling of the ship went off without any problems.

The CMA CGM “Tobruk” has a capacity of 1,000 TEUs and a length of 150 m.

From August/September, it is planned to handle two feeder ships per week. From October, full cargo ships are expected to regularly dock at the terminal.

EUROGATE Tanger currently has 300 m of quayside and five container cranes. By the end of the year, the quay length will be extended to 800 m. An additional three container cranes are on order for delivery in February 2009.



Positive conditions for investing during the economic downturn From Europe to the Middle-East to Down Under, the talk of the day is how much volume has vanished into thin air. Slashing cost, cutting jobs, delaying works, it’s the talk of the day.
Noble Denton appoints renewables group managing director Noble Denton, the leading global offshore engineering and marine services company, today announces the appointment of Ian Bonnon as group managing director, renewables.

All contents (C) copyright 2004-2007 Maritime Information Services Ltd. All rights reserved.   -   Henley Media Group